Pipe Laying Works:
Excavation for all types of utility pipelines.
Murum bedding preparation to specified thickness.
Laying and jointing of pipes as per approved specifications.
Backfilling with approved material followed by layer-wise compaction.
Road Subgrade Preparation:
Excavation and leveling of subgrade as per design profiles.
Water sprinkling and mechanical compaction to achieve required density.
Execution in compliance with technical specifications and project standards.
Granular Sub Base (GSB) Layer Works:
Spreading of GSB material layer-wise using mechanical grader.
Water sprinkling and compaction after each layer as per design specifications.
Work Completion Value: ₹2.30 Crore
All work has been executed in accordance with the technical standards, quality guidelines, and project-specific requirements.